Barndominium floor plan and elevation drawings laid out on a drafting table with a scale rule.

Custom Barndominium Plans in Washington State

We draw custom barndominium plans for Washington State land, from the first floor plan sketch to the drawing set your city or county building department reviews. Washington law lets a non-architect prepare the design for a residential building of up to four dwelling units, so a barndominium can be drawn without an architect. What a Washington set has to carry is specific: the energy code credits the house earns, the design values your jurisdiction sets, and a site plan that shows the well, the septic system and any wetlands, streams or slopes.

Frame designed by the manufacturer's engineer for your site
Sized to your city or county's snow, wind and seismic values

Custom Barndominium Floor Plans

Most custom barndominium floor plans start from one of a few shapes: a simple rectangle with the living space at one end and a shop at the other, an L with a porch in the corner, or a two-story or lofted plan where the bedrooms sit over the living area. We start with how you live and what the shop is for, then pick the shape and footprint that fits your land, rather than squeezing your life into a stock plan.

Our floor plans section has starting points by size and by feature, from a small plan to a 40x60 with a shop. Any of them can be changed: rooms moved, a porch added, a loft taken out. A custom plan is also where the practical Washington questions get answered early, such as where the mechanical room goes for a heat pump and water heater, how much glass the energy calculation will carry, and which way the building faces for winter light on the west side or summer shade on the east side.

Barndominium floor plans

What a Washington Permit Set Has to Show

The residential code in Washington is the International Residential Code as adopted and amended by the state, applied in every city and county. Each local jurisdiction sets its own climatic and geographic design criteria, such as snow load, wind, frost depth and seismic values, so the structural notes on your drawings are written to your jurisdiction's values, not a generic set.

Two Washington requirements shape the drawings more than people expect. The Washington State Energy Code requires each new house to earn additional energy efficiency credits by size, and the drawings submitted with the building permit application have to identify which options were chosen and the credit value of each. And on rural land the site plan does more work: it shows the well or water connection, the septic system and its reserve area as permitted by the local health jurisdiction, setbacks, and any wetland, stream, steep slope or shoreline on or near the parcel.

The structural frame drawings for a steel or post frame come from the frame manufacturer, designed by its engineer for your site. We draw the house around the frame and put the whole set together for submittal, and if plan review comes back with comments we revise the drawings.

Custom Plans: how the work runs

Four stages, in this order. The sequence matters more than it looks: on rural Washington land, settling the water supply, the septic permit and the building permit before anything is fabricated is what keeps a build from stalling.

1

Brief and site

We start with how you want to live, what the shop is for, your budget, and the parcel: its zoning, slope, access, and where water and septic can go. The site shapes the plan more than any catalogue does.

2

Floor plan and elevations

We draw the floor plan and the exterior, and revise until the layout works. Window area and the heating approach are chosen here too, because they decide the energy code credits.

3

Permit drawings

The floor plans, elevations, sections, site plan, energy code credit worksheet and the manufacturer's frame drawings are put together as one set for your city or county building department.

4

Plan review and revisions

The building department reviews the set and may send comments. We revise the drawings to answer them, so the approved set is the one the house is built from.

Overhead view of architectural floor plan and structural elevation drawings spread on a workbench with a scale ruler and pencil.
Drawn for your jurisdiction

One state code, but your city or county sets the numbers

Washington applies one state building code in every city and county, and leaves the climatic and geographic design criteria to each local jurisdiction. A set drawn for a lot on the Kitsap Peninsula and a set drawn for a lot outside Spokane can share a floor plan and still carry different snow, frost and seismic notes. We draw to the values your building department publishes.

Where we deliver custom plans

In Washington the first line that matters is usually a city limit. Cities and counties enforce the state building code and issue residential building permits: usually the city building department inside city limits and the county in unincorporated land, where most barndominiums are built and where the county's comprehensive plan sets rural densities. The state building code is the same on both sides of every line. What changes is the zoning, the snow, wind, frost and seismic values the jurisdiction sets, the local health jurisdiction that permits the septic system, and how the house shows an adequate water supply.

Barndominium builders across Washington State.

Every city and county has its own answer on permits, septic and water. The service area pages set out what each one publishes.

View our full service area →
Before you commit

What actually decides the price

Square footage is the number everyone leads with, and it is rarely the one that moves a barndominium budget. These four do.

  • How custom the plan is

    Adjusting a starting plan costs less than a plan drawn from a blank page. Most people land somewhere in between: a familiar shape with their own rooms, porch and shop.

  • Stories and loft

    A single-story plan is the simplest to draw and build. Lofts and second floors add stairs, structure, fire separation and energy detail.

  • Site complexity

    A flat, clear lot needs a simple site plan. A sloped lot, a parcel with wetlands or a stream, or one where the well and septic are hard to fit needs more work before the house can be placed.

  • Plan review rounds

    Some jurisdictions return more comments than others. Each round of revisions takes time, which is why the first submittal is drawn to be complete.

Barndominium floor plan and elevation drawings laid out on a drafting table with a scale rule.

Custom Plans in Washington: common questions

8 questions we get asked most often about building in Washington. If yours is not on the list, ask it directly.

Do I need an architect to design a barndominium in Washington?
No. Washington's architect licensing law does not prevent a non-architect from doing the design work for a residential building of up to four dwelling units, so a single-family barndominium can be drawn without an architect. The structural frame is designed by the frame manufacturer's engineer.
Can you change one of your floor plans?
Yes. Our floor plans are starting points. Rooms can be moved, added or removed, the shop resized, and porches or a loft added or taken away.
What does the permit set include?
Typically floor plans, elevations, building sections, a site plan, the energy code credit worksheet, and the frame manufacturer's drawings and foundation details. Your building department may ask for more, such as a drainage plan or a report on a wetland or slope.
Why do the energy code credits have to be on the drawings?
The Washington State Energy Code requires the drawings submitted with the permit application to identify which additional efficiency options were chosen and the credit value of each. That makes the energy decisions part of the design, not something left to the end.
Will my plan work anywhere in Washington?
The floor plan can, but the structural notes are site-specific. Each city or county sets its own snow load, wind, frost depth and seismic values, so the set is adjusted to the jurisdiction the lot is in.
How long do custom plans take?
It depends on how much the plan changes and how many revision rounds you want. Plan review time at the building department is separate and varies by jurisdiction. Our build timeline guide covers the whole sequence.
Can I use my own builder with your plans?
Yes. You can take the approved set to any builder. We also build, if you want one team from plan to finish.
What is the difference between a stock plan and a custom plan?
A stock plan is drawn once for a generic site. A custom plan is drawn for your family, your shop and your parcel, with the structural notes, energy code credits and site plan for your jurisdiction. Many custom plans start from a stock layout and change it.

Ready to put custom plans against a real plan? Start there and the rest follows.

Tell us about the land

Tell us where the parcel is and what you want on it, and we will come back with who has jurisdiction, what the land needs before it can be built on, and a realistic budget range. Starting the survey costs nothing.